
New Build – Trevone Bay
Following a fire, the owners took the opportunity to carry out a new build in its stunning location, which required detailed planning and design.
Following a fire, the owners took the opportunity to carry out a new build in its stunning location, which required detailed planning and design.
New large steel framed storage buildings were required at the EA depot’s at Tolgus in Redruth and Pennygillam in Launceston.
The same storms that claimed the nearby sea wall in 2014 caused damage to this prominent retaining wall along the main road into the town.
The new Anti-Terrorism Force Protection (AFTP) access for this important secure RAF base required the use of US standards for defence projects.
The access down to Kynance cove suffered severe storm damaged and required replacement with stone-faced, reinforced concrete steps.
From Bakery to Pharmacy, this building required major listed building renovations to open up its ground floor for better usability.
This project included the design and management for the construction of a double garage and terrace in a steeply sloping front garden.
The historic Teignmouth pier suffered storm damage from waves coming up through the floor, smashing the timber structure and damaging the internal finishes.
This period property conversion transformed this original Victorian property into high-tech, high-spec 21st Century apartments.
Working in a multidisciplinary team with other professionals designing a prestigious extension for the Natural Trust's Castle Drogo Visitor Centre.