
Cliff Stabilisation
A landslip at this popular cove on the Lizard Peninsula required the cliff face to be stabilised to protect the road above.
A landslip at this popular cove on the Lizard Peninsula required the cliff face to be stabilised to protect the road above.
The new Anti-Terrorism Force Protection (AFTP) access for this important secure RAF base required the use of US standards for defence projects.
The access down to Kynance cove suffered severe storm damaged and required replacement with stone-faced, reinforced concrete steps.
From Bakery to Pharmacy, this building required major listed building renovations to open up its ground floor for better usability.
This project included the design and management for the construction of a double garage and terrace in a steeply sloping front garden.
The historic Teignmouth pier suffered storm damage from waves coming up through the floor, smashing the timber structure and damaging the internal finishes.
This period property conversion transformed this original Victorian property into high-tech, high-spec 21st Century apartments.
Working in a multidisciplinary team with other professionals designing a prestigious extension for the Natural Trust's Castle Drogo Visitor Centre.
A flood protection scheme to protect access to arable land for the Duchy of Cornwall, developed in consultation with the Environment Agency.
Listed chimney stack repairs were carried out following damage from a lightning strike - this site is in an exposed location with no vehicular access.