
Mariners Garden, Looe
When a large bulge appeared in the quay wall to Mariners Garden, it was feared that the wall would collapse into the river. JLA devised a comprehensive repair scheme which minimised disruption.
When a large bulge appeared in the quay wall to Mariners Garden, it was feared that the wall would collapse into the river. JLA devised a comprehensive repair scheme which minimised disruption.
The former Carnewas Mine Shaft began opening up causing a large hole in the corner of a field. Work permanently to cap the shaft was essential to avoid a catastrophic accident.
The West Portico at Trelissick was in need of repairs and renovation when it was discovered that the old steelwork supporting the structure was badly corroded.
This project successfully updated and improved a tired and deteriorated building in much need of modernisation and improvement. Making the most of its enviable coastal location of Downderry overlooking the sea, an incredible transformation which enhances the local built environment.
Structural design and Listed Building & Highways consents for the Carcaddon Bridge replacement on the Trelissick Estate in Cornwall.
We carried out a measured site survey and detailed section drawings to allow the development of this re-landscaping project.
We carry out structural surveys and inspections of a variety of buildings ranging from commercial buildings, to domestic properties and historic buildings.
Following a major fire at the former Homebase in Liskeard, the steel structure was badly damaged and the commercial space ravaged.
When significant cracking occurred in this listed building, James Lockyer Associates determined the reasons and recommended the appropriate repair solution.
When a cliff in the rear garden of this fine property in Mylor Creek collapsed, an anchored slope stabilisation design was implemented.