
Foundation Movement
An insurance claim for foundation movement due to a leaking water pipe at this house in a conservation area to led us to provide structural design details.
An insurance claim for foundation movement due to a leaking water pipe at this house in a conservation area to led us to provide structural design details.
Years of movement and tidal action made this quay wall and garden above unstable, we designed and oversaw the installation of drilled anchors to stabilise the wall.
When significant cracking occurred in this listed building, James Lockyer Associates determined the reasons and recommended the appropriate repair solution.
This project involved demolition of an existing property and the construction of a large new building to meet the requirements and standards of the client.
A bespoke structural design was required for the piled foundations for a platform of a barbecue cabin situated over a lake.
The client returned to James Lockyer Associates when they decided to create a larger garage space and improve the access to the front of the property.
This 2.4 metre high perimeter security fence was designed to BS1722 Part 10 and installed for Anti-Terrorism Force Protection (ATFP).
This project involved the construction of a new Anti-Terrorism Force Protection (ATFP) parking area for to this important secure RAF base.
The tenant of a farm owned by The National Trust wanted to carry out a photovoltaic (PV) panel feasibility study on the roof of an agricultural barn.
Mining investigations identified a mine shaft in the garden of this property which extended under the rear wall requiring the need for a mine shaft cap.