
Listed Chimney Stack Repairs
Listed chimney stack repairs were carried out following damage from a lightning strike - this site is in an exposed location with no vehicular access.
Listed chimney stack repairs were carried out following damage from a lightning strike - this site is in an exposed location with no vehicular access.
Design of a reinforced concrete structural lining for a reservoir in a semi-buried concrete structure.
Structural design to repair defects in a listed building that had suffered bomb damage in 1942.
Designing a cost-effective foundation for a site containing contaminated mine waste.
A new firing range for the MoD, accessed through a holiday park and situated within a protected wildlife habitat.
Liaising with local residents, Environment Agency and Local Authority Planning Dept to design and deliver a new access road across two private gardens.
Working with a local community and grant funding body for design and delivery of a project creating a community space and play area.
An office modernisation project to create an open-plan working environment in a former cottage and stable dating back to the 1800’s.
Emergency works to safeguard a large retaining wall that collapsed unexpectedly, followed by reconstruction works with a minimum of disruption to residents.